# Blog

Notes on building products, and the companies around them. What we have learned shipping our own software, and running the operations behind it.

- November 8, 2026 **[How Fractional CTO Pricing Works: Retainers, Terms, and What Sets the Number](https://www.senter.net/blog/how-fractional-cto-pricing-works)** Why fractional CTOs bill a retainer instead of hours, what moves the monthly number, how it compares with a full-time hire, and the six things a proposal should spell out. [Read it](https://www.senter.net/blog/how-fractional-cto-pricing-works)
- November 8, 2026 **[What Drives MVP Development Cost, and How to Keep It Down](https://www.senter.net/blog/what-drives-mvp-development-cost)** The five things that set an MVP quote, why a fixed scope at a fixed price protects the founder, how to cut cost without cutting quality, and what a quote should include. [Read it](https://www.senter.net/blog/what-drives-mvp-development-cost)
- August 4, 2026 **[Pricing Your First Product: Why Free Is the Most Expensive Number](https://www.senter.net/blog/pricing-your-first-product)** The hardest part of pricing a first product is not the number. It is that charging money is the only test that tells you whether anyone actually wants the thing. Free postpones that test, and the delay is the expense. [Read it](https://www.senter.net/blog/pricing-your-first-product)
- July 30, 2026 **[Build vs Buy: What Belongs in Your MVP and What You Should Rent](https://www.senter.net/blog/build-vs-buy-first-product)** There is exactly one part of a first product that has to be yours: the thing you are here to prove. Everything else is plumbing, and plumbing is cheaper to rent than to build. The hard part is drawing the line precisely. [Read it](https://www.senter.net/blog/build-vs-buy-first-product)
- July 28, 2026 **[How We Choose an MVP's Tech Stack (and Why Boring Still Wins)](https://www.senter.net/blog/how-we-choose-an-mvp-tech-stack)** The stack feels like an engineering choice, so it gets made on engineering grounds. It is really a decision about how fast you can change the product a year from now. So we pick the boring one on purpose. [Read it](https://www.senter.net/blog/how-we-choose-an-mvp-tech-stack)
- July 23, 2026 **[The Handoff: Taking a Studio-Built MVP In-House Without Losing Momentum](https://www.senter.net/blog/taking-a-studio-built-mvp-in-house)** The risk is not that a studio builds the wrong thing. It is that the day the studio leaves, the team inheriting the code cannot move at the speed it was built at. A clean handoff is a design decision, not a closing formality. [Read it](https://www.senter.net/blog/taking-a-studio-built-mvp-in-house)
- July 21, 2026 **[When Not to Build: How We Talk Founders Out of Their First MVP](https://www.senter.net/blog/when-not-to-build-first-mvp)** The fastest way to waste a first build is to build it. Half the founders who come to us for an MVP need a week of validation more than they need a codebase, and we would rather say so. [Read it](https://www.senter.net/blog/when-not-to-build-first-mvp)
- July 17, 2026 **[BeeReady Is Officially a 501(c)(3): What Building End to End Really Means](https://www.senter.net/blog/beeready-501c3-what-end-to-end-means)** We say we build companies, not just apps. A federal determination letter is the kind of proof you cannot fake: BeeReady, the nonprofit we stood up from zero, is now a recognized 501(c)(3). [Read it](https://www.senter.net/blog/beeready-501c3-what-end-to-end-means)
- July 16, 2026 **[Go-to-Market for Technical Founders: A Launch Checklist](https://www.senter.net/blog/go-to-market-launch-checklist)** The launch is not the day you ship. It is the six weeks of positioning, surfaces, and measurement around the day you ship. Most technical founders only do the middle. [Read it](https://www.senter.net/blog/go-to-market-launch-checklist)
- July 16, 2026 **[The Founder Bottleneck: When to Bring in a Fractional COO](https://www.senter.net/blog/founder-bottleneck-fractional-coo)** The company does not slow down because the work is hard. It slows down because every decision still routes through one person, and that person is out of hours. [Read it](https://www.senter.net/blog/founder-bottleneck-fractional-coo)
- July 15, 2026 **[Where AI-Assisted Development Still Fails](https://www.senter.net/blog/where-ai-assisted-development-fails)** We use AI on every project we ship. We also spend real time undoing what it does. Pretending otherwise makes teams trust the output more than they should. [Read it](https://www.senter.net/blog/where-ai-assisted-development-fails)
- July 14, 2026 **[What a Fractional CTO Actually Does in the First 30 Days](https://www.senter.net/blog/fractional-cto-first-30-days)** The first month of a fractional CTO engagement is mostly listening, measuring, and fixing the two things that are quietly costing the team a day a week. [Read it](https://www.senter.net/blog/fractional-cto-first-30-days)
- July 14, 2026 **[How to Hire Your First Engineer When You Are Not Technical](https://www.senter.net/blog/hiring-your-first-engineer-non-technical-founder)** You cannot evaluate the code, so you have to evaluate everything around it. The first engineer is the one hire where getting the process right matters more than getting the resume right. [Read it](https://www.senter.net/blog/hiring-your-first-engineer-non-technical-founder)
- July 13, 2026 **[From Idea to MVP in Weeks: How a Studio Compresses the Build](https://www.senter.net/blog/idea-to-mvp-in-weeks)** Most MVP timelines are not lost to writing features. They are lost to deciding things that did not need deciding, and to redoing setup that should have been standard. [Read it](https://www.senter.net/blog/idea-to-mvp-in-weeks)
- July 12, 2026 **[Operational Consistency Is the Real Moat](https://www.senter.net/blog/operational-consistency-real-moat)** When generating code is cheap, the scarce thing is doing the unglamorous parts the same way every time. That is an operations problem, not an engineering one. [Read it](https://www.senter.net/blog/operational-consistency-real-moat)
- July 11, 2026 **[Why We Treat Prompts Like Infrastructure, Not Conversations](https://www.senter.net/blog/prompts-as-infrastructure)** A prompt you retype is a conversation. A prompt you version, review, and reuse is infrastructure. Only one of those compounds. [Read it](https://www.senter.net/blog/prompts-as-infrastructure)
- July 10, 2026 **[The Production Checklist AI Skips: 18 Things Between a Demo and a Live Site](https://www.senter.net/blog/production-checklist-ai-skips)** Every AI-generated site we have inherited was missing the same eighteen things. None of them are visible in a screenshot. All of them are visible to Google. [Read it](https://www.senter.net/blog/production-checklist-ai-skips)
- July 9, 2026 **[How We Ship Production Websites Faster with Reusable Claude Code Skills](https://www.senter.net/blog/reusable-claude-code-skills-production-websites)** The React components are the easy part now. Prerendering, share images, CSP headers, and sitemaps are what still take days. So we stopped writing prompts and started writing infrastructure. [Read it](https://www.senter.net/blog/reusable-claude-code-skills-production-websites)

Source: https://www.senter.net/blog
